4. Machine bed leveling of another side
Put the bridge on the leveled side of machine bed, put the level gauge on the bridge to level another side of the machine bed.
5. Bridge installation
Put the seal on the left side of the bridge, then, put the install the bridge on the left side of the bed; connect to the right side of the bed. The machine bed installation will be done after welding the bed plate and pre-buried plate.
6. Gantry installation
Lift the gantry, and put on the locating pin and slide carriage bolts on one side, and then install the locating pin through rotating the ball screw. The process of the installation should be smooth and easy. After put the gantry and the slide carriage, fix the bolts.
Address: No. 3999 , Airport Road, Lingang Economic Development Zone, Jinan,Shandong,China
Zip:250107 Fax:0531-8873 5288 Sales Hotline:0531-8873 5188
After-Sales Hotline:136 0641 1517/150 2000 3877/133 0531 7322