Stereo garage equipment CNC H beam drilling machine preparation before start
For the early detection of three-dimensional garage equipment CNC H beamdrilling machine machine fault prevention of accidents, please be sure to check before start.
Before connecting the power cable, wire: if breakage, crack, cause leakage,electric shock hazard. Therefore, before turning on power, please make sure thatthere is no leakage. If leakage, the situation of power, please immediately to findparking equipment CNC H beam drilling machine professional repair personnel to deal with.
Note: before starting to see around the machine whether other people orobstacles, whether there is oil, ground water. Oil and water may lead to slip,please wipe clean after operation.
Stereo garage equipment CNC H beam drilling machine host check: check themechanical connection strong, is loose and damage situation, pay special attention to the coupling, ball screw and other active clearance is appropriate,should be timely tightening and adjustment. Check all lubricating points whetheroil and grease filling provisions. The motor has no abnormal sound, abnormal vibration, the sliding surface lubrication
Stereo garage equipment CNC H beam drilling machine coolant unit checks:coolant quantity properly, whether the product of chip, the pump is working properly.
Connect the power supply: switch on the power must be carried out according to the prescribed procedures, abnormal sound and vibration, please CNC H beamstereo garage equipment drilling machine professional repair.
Note: CNC H beam drilling stereo garage equipment machine long after cessation of use, starting again, please carefully check the movement, sound, lubricationand other abnormal.
cc:kevin kevin@jntime.comAddress: No. 3999 , Airport Road, Lingang Economic Development Zone, Jinan,Shandong,China
Zip:250107 Fax:0531-8873 5288 Sales Hotline:0531-8873 5188
After-Sales Hotline:136 0641 1517/150 2000 3877/133 0531 7322